Opens in a new tab
Globe Country

Tisa Rua Multistorey Development

reliability and optimisation hero
0m2
Ground Floor Area
0m2
Tower Floor Area
0m2
GFA
0m2
NFA

Overview

Delivering a Premium Mixed-Use Landmark with Cultural Depth and Commercial Purpose

Kramer Asia Pacific were engaged by Teachers Savings and Loan Society (TSL) as a returning client, to provide full suite of professional services for a new ten (10) storey development in Waigani.

The site is adjacent to the existing seven (7) storey Tisa Haus building Kramer Asia Pacific previously designed and project managed over two decades ago.

As a well-managed savings and loan society, TSL sought to invest into property and development while also catering to their own growing requirements for additional commercial office space. TSL then engaged KAPAC to provide initial concept assessment and site master planning services.

The multistorey development is a mixed-use podium and tower, consisting of retail and restaurants on ground floor and level 1 podium, with commercial office space occupying tower levels 2-8, with one level of 3 luxury residential penthouse apartments. The project aspires to be a high-end quality development appealing to the discerning retail, commercial, or residential tenant.

  • Commercial & Residential
Project Management Design, Contract Administration, Superintending Construction Verification
Waigani, Port Moresby, Papua New Guinea
Teachers Savings & Loan Society (TSL)
est. November 2022

Problem

Meeting Growth Demands While Maximising Investment Potential

TSL, a growing savings and loan society, faced a dual challenge:

  1. Space Constraint

    Their existing Tisa Haus facility no longer accommodated expanding commercial operations.

  2. Strategic Investment

    TSL sought a high-value, income-generating real estate project that aligned with their long-term financial goals.

Given the premium urban site and increasing demand for quality office and retail space, the client required a sophisticated, landmark development that could meet their internal needs and attract premium tenants.

Tisa Rua is inspired by the architectural nuances of the 
Kairuku stilt house

Tisa Rua Multistorey Development
reliability and optimisation hero

Solution

A Landmark Development Blending Cultural Identity with Commercial Vision

Kramer Asia Pacific (KAPAC) delivered a holistic project solution across all phases:

Design & Planning

  • Master planning and conceptual development that respected the cultural heritage of the site, inspired by the Kairuku Hiri stilt house.
  • Integrated Environmentally Sustainable Design (ESD) principles suited to the Pacific climate.
  • Developed a mixed-use building:
    • Retail & restaurant (Ground & Level 1)
    • Commercial offices (Levels 2–8)
    • 3 luxury residential penthouses (Top Level)

Project Management & Delivery

  • Full lifecycle management: Design, tender, approvals, contract administration, and superintendence.
  • Managed all statutory approvals, including Physical Planning and Building Board.
  • Administered AS2124 Contract Conditions and contractor oversight, ensuring the project stayed under budget and ahead of schedule, even amid COVID-19 challenges.

Engineering & Technical Services

  • Structural, civil, and building services engineering across all stages.
  • Partnered with specialist consultants for lighting, surveying, geotechnical, and certification.
  • Coordinated multi-disciplinary teams, conducted site inspections, and issued regular progress and compliance reports.

An Integrated, Culturally-Inspired 
Mixed-Use Development in Port Moresby

The Tisa Rua Multistorey Development stands as a testament to what’s possible when strategic vision, cultural insight, and technical expertise align. Through a fully integrated approach, Kramer Asia Pacific supported Teachers Savings & Loan Society in delivering a high-quality, future-focused development that balances commercial returns with architectural significance.

Completed ahead of schedule and under budget, the project reinforces KAPAC’s ability to lead complex, multi-stakeholder developments from concept through to completion — delivering value, efficiency, and enduring impact in the heart of Port Moresby.

  • 36 months Project Duration
  • >PGK 100m Project Value
  • 10 storeys Tower Levels

See the Complete
Project Details

Access the complete project factsheet for a comprehensive overview of our role, the project’s challenges, and the successful outcomes. This report provides key technical data and a full description of our management approach.

Download PDF

Related Sectors